QUALITY ENGINEERING
Zero Tolerance for Defects. Your Engineers on the Factory Floor.
END-TO-END QUALITY FIREWALL
Nothing leaves the factory without passing these gates.
01
FACTORY AUDIT
Verify ISO certs, machinery capacity, and financial health before deposit.
02
MID-PRODUCTION
Inspect the first 20% batch to catch component errors early.
03
PRE-SHIPMENT
100% Final Inspection based on AQL 2.5 Standard. Drop tests & function checks.
04
LOADING CHECK
Supervision of container loading to prevent crushing and verify quantity.
REC
VISUAL VERIFICATION
WE DON'T JUST SEND PDFS. WE SEND VIDEO PROOF.
Paper reports can be faked. Unedited video footage cannot. See the product quality, function testing, and packaging details with your own eyes before the goods leave China.
- Real-time Function Testing
- Destructive Testing (Drop/Waterproof)
- Packaging Details Close-up
WE FOLLOW AQL 2.5
We use the international Acceptable Quality Limit standard. If defects exceed these limits, the shipment is rejected.
| Order Qty | Sample Size | Reject (Major) |
|---|---|---|
| 2 - 15 | All | 0 |
| 151 - 280 | 32 | 2 |
| 501 - 1200 | 80 | 5 |
| 1201 - 3200 | 125 | 7 |
| 3201+ | 200 | 10 |
TRANSPARENCY FIRST
See What a Real Audit Report Looks Like
Don’t guess what you’re paying for. Download a sanitized sample report to see our checklist, photo standards, and AQL formatting.