QUALITY ENGINEERING

Zero Tolerance for Defects. Your Engineers on the Factory Floor.

END-TO-END QUALITY FIREWALL

Nothing leaves the factory without passing these gates.

01

FACTORY AUDIT

Verify ISO certs, machinery capacity, and financial health before deposit.

Doc: Audit Report

02

MID-PRODUCTION

Inspect the first 20% batch to catch component errors early.

Video: Live Check

03

PRE-SHIPMENT

100% Final Inspection based on AQL 2.5 Standard. Drop tests & function checks.

Doc: Pass/Fail Report

04

LOADING CHECK

Supervision of container loading to prevent crushing and verify quantity.

Photo: Loading Proof

REC

VISUAL VERIFICATION

WE DON'T JUST SEND PDFS. WE SEND VIDEO PROOF.

Paper reports can be faked. Unedited video footage cannot. See the product quality, function testing, and packaging details with your own eyes before the goods leave China.

WE FOLLOW AQL 2.5

We use the international Acceptable Quality Limit standard. If defects exceed these limits, the shipment is rejected.

Critical Defect
0 Allowed
Major Defect
2.5 Allowed
Minor Defect
4.0 Allowed
Order Qty Sample Size Reject (Major)
2 - 15All0
151 - 280322
501 - 1200805
1201 - 32001257
3201+20010
TRANSPARENCY FIRST

See What a Real Audit Report Looks Like

Don’t guess what you’re paying for. Download a sanitized sample report to see our checklist, photo standards, and AQL formatting.

SOURCEYK

PASSED

Product Photo Evidence
Scroll to Top